![]() ![]() ![]() ![]() ANR found, among other things, that our proposal would improve the recreational access to the lake and river and would protect water quality by removing sediments which are stirred up by boaters and high velocity flows. In June 2012 the LRA submitted a Dredging Applicationwhich was approved by the Vermont Agency of Natural Resources (ANR) to commission a dredging project to remove a significant amount of this sediment. The flooding and subsequent degradation of river and stream banks resulted in the depositing of an estimated 1,200 cubic yards of sediment into Round Pond, particularly around the mouth of the Black River inflow, making navigation dangerous or impossible in that area. Speciality was that the dredging was done while maintaining position using the Roxane Z Dynamic Positioning system (DP2), allowing more flexibility in the vessel movements while dredgingĪfter succesfully dredging all material, the vessel demobilized and our equipment and operators travelled back to our base in The Netherlands.On SeptemTropical Storm Irene descended on our lake community, wreaking devastation far and wide. Offshore sand was dredged to clear an installation and discharged via the DOP 250 booster and discharge pipeline. DPS mobilized several truckloads with our DOP 250 dredge pump in booster set up, hydraulic powerpacks and heavy duty jet water pump and discharge pipelines.Īfter arrival of the trucks in the port of mobilization our colleagues assisted the clients vessel crew to install the complete dredging spread on board the vessel, after different test runs the vessel sailed out and the dredging commenced. Our client Jifmar Offshore Services was in need of additional dredging equipment and operators for his offshore dredging project offshore Brittany in France. Offshore dredging Offshore Brittany, France ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |